X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone, and then after 4 days, Y joined him until the completion of the work. How long did the work last?
Answer: 10 days
Explanation
X can do the work in 20 days, so X's work rate is 1/20 of the work per day.
Y can do the work in 12 days, so Y's work rate is 1/12 of the work per day.
X works alone for 4 days, completing 4/20 = 1/5 of the work.
Y joins X, and together they complete the remaining 4/5 of the work.
Their combined work rate is (1/20 + 1/12) = 8/60 = 2/15 of the work per day.
Since they complete 4/5 of the work together, it takes them (4/5) / (2/15) = 6 days to complete the remaining work.
Adding the 4 days X worked alone, the total duration is 4 + 6 = 10 days.
So, the correct answer is: 10 days.
This question appeared in
Past Papers (4 times)
PPSC 5 Years Past Papers Subject Wise (Solved with Details) (2 times)
PPSC Assistant Past Papers PDF (1 times)
PPSC Past Papers (1 times)
This question appeared in
Subjects (1 times)
MATHS MCQS (1 times)
Related MCQs
- P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in _______ days.
- A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the whole work, the daily wages of B and C are:
- A completes a work in 12 days. B completes the same work in 15 days. A started working alone and after 3 days B joined him. How many days will they now take together to complete the remaining work?
- Shaista completes a piece of work in 10 days, All completes the same work in 40 days, if they work together, the days required to complete the work will be _________
- Sixteen men can complete a work in twelve days. Twenty-four children can complete the same work in eighteen days. Twelve men and eight children started working and after eight days three more children joined them. How many days will they now take to complete the remaining work?
- 12 men can complete a work in 90 days. 30 days after they started work, 2 men left and 8 men joined. How many days will it take to complete the remaining work_____?
- A and B together can complete a work in 3 days. They start together but after 2 days, B left the work. If the work is completed after two more days, B alone could do the work in ____?
- Hamza can do a work in 15 days and Aslam in 12 days. If they work on it together for 4 days, the fraction of work that is left is________?
- A and B can do a piece of work in 12 days B and C in 15 days C and A in 20 days then that numbers of days taken by A B and C together to finish the work are?
- A and B can do a piece of work in 12 days, B can C in 8 days and C and A in 6 days. How long would B take to do the same work alone?