If 12 men and 16 boys can do a piece of work in 5 days; 13 men and 24 boys can do it in 4 days, then the ratio of the daily work done by a man to that of a boy is:
Answer: 2 : 1
Explanation
We are given:
12 men + 16 boys complete the work in 5 days
13 men + 24 boys complete the work in 4 days
We need to find the ratio of the daily work done by a man to that of a boy.
Step 1: Let M be work done by 1 man in 1 day and B be work done by 1 boy in 1 day
5(12M+16B)=1
4(13M+24B)=1
Step 2: Convert to equations
12M+16B=⅕
4(13M + 24B) = 1
Step 3: Solve for M and B
Multiply first equation by 4:
48M+64B=⅘
Multiply second equation by 5:
65M+120B=5/4
Convert fractions:
4/5=0.8,5/4=1.25
Solving simultaneously:
Using elimination: Multiply (48M + 64B = 0.8) by 5:
240M+320B=4240M + 320B = 4240M+320B=4
Multiply (65M + 120B = 1.25) by 4:
(260M+480B)- (240M + 320B) =5-4
20M + 160 b = 1
Dividing by 20:
M+8B=1/20M
Substituting M = 2B from Question 69:
2B+8B=1/20
10B=20/1
B=1/200B
M=2×1/200=2/200=1/100M
Thus, ratio M:B = 2:1.
This question appeared in
Past Papers (4 times)
ASF Inspector Past Papers (1 times)
ASF Past Papers (1 times)
FPSC 5 Years Past Papers Subject Wise (Solved With Details) (1 times)
FPSC Past Papers (1 times)
This question appeared in
Subjects (1 times)
MATHS MCQS (1 times)
Related MCQs
- A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the whole work, the daily wages of B and C are:
- X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone, and then after 4 days, Y joined him until the completion of the work. How long did the work last?
- Shaista completes a piece of work in 10 days, All completes the same work in 40 days, if they work together, the days required to complete the work will be _________
- P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in _______ days.
- A and B can do a piece of work in 12 days B and C in 15 days C and A in 20 days then that numbers of days taken by A B and C together to finish the work are?
- 30 labourer's working 7 hours a day can finish a piece of work in 18 days, if the Labourer's work 6 hours a day, the number of Labourers required to finish the same piece of work in 30 days will be _________.
- A and B together can complete a work in 3 days. They start together but after 2 days, B left the work. If the work is completed after two more days, B alone could do the work in ____?
- 12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job, and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it is to be completed in 3 days?
- Hamza can do a work in 15 days and Aslam in 12 days. If they work on it together for 4 days, the fraction of work that is left is________?
- A and B can do a piece of work in 12 days, B can C in 8 days and C and A in 6 days. How long would B take to do the same work alone?