A. None of these option
-
B. gases pass through opening
-
C. gases pass through narrow opening
-
D. gases pass through brought opening
Explanation
- The blades spin at high speed and compress or squeeze the air.
- The compressed air is then sprayed with fuel and an electric spark lights the mixture.
- The burning gases expand and blast out through the nozzle, at the back of the engine.
- As the jets of gas shoot backward, the engine and the aircraft are thrust forward
تھل نووا کس سیکٹر کا منصوبہ ہے؟
-
A. Education
-
B. Healthcare
-
C. Agriculture
-
D. Energy
Explanation
ThalNova will be the second coal-fired power plant to be set up in Tharparker district of Sindh
This was followed by the signing of a shareholder agreement in 2018 between:
- Thal Limited (House of Habib)
- Novatex (a subsidiary of Gani & Tayub)
- Hub Power Holdings Limited (HUBCO)
-
A. سولر
-
B. تھرمل
-
C. پانی
-
D. ہوا
Explanation
- the largest source of electricity generation in Pakistan is the Thermal
- ***
- List of Pakistan's Largest Source of Energy:
- 1. Thermal (Coal)
- 2. Hydroelectric.
- 3. Natural gas.
- 4. Nuclear.
- 5. Solar.
- 6. Wind.
- The largest Thermal electricity generation plant is in Kot Addu Power Company
- Capesty:1600 MW
AGM 31-12-2022
پاکستان میں بجلی کا سب سے بڑا ذریعہ .... ہے
-
A. Natural source
-
B. none
-
C. Thermal
-
D. Hydal
Explanation
According to the Electric Sector Of Pakistan:
The largest and biggest source of electricity generation in Pakistan is Natural gas
The second largest and biggest source of electricity generation in Pakistan is Hydal
Electricity generation
Natural gas: 32.3% of the total.
Hydroelectric: 24.7% of the total.
Furnace oil: 14.3% of the total.
Coal: 12.8% of the total.
Nuclear: 8.8% of the total.
Wind: 4.8% of the total.
Solar:1.4% of the total.
Bagasse: 0.9% of total.
ND23-2-2023
وفاقی حکومت نے کس سال تھر کول اتھارٹی قائم کی؟
-
A. 2008
-
B. 2009
-
C. 2006
-
D. 2007
Explanation
✅ Correct: 0 |
❌ Wrong: 0 |
📊 Total Attempted: 0