15 weaver can weave some length of cloth in 1 hr.24 minutes .how many weavers are required to do the same job in 60 minutes ?
Answer: 6
Explanation
6 more weavers are required to finish the task in 60 minutes
***
ND17-1-2023
This question appeared in
Past Papers (1 times)
IBA STS Past Papers, Syllabus, Jobs (1 times)
This question appeared in
Subjects (1 times)
MATHS MCQS (1 times)
Related MCQs
- 4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would be woven by 8 mat-weavers?
- A tank is filled by one tap in 20 minutes and by another in 25 minutes. If both tapes are kept open for 5 minutes and then the second is turned off. In how many minutes the tank will be completely filled?
- . There are 40 minutes to solve a test of 60 questions. A student completes 20 questions in 20 minutes He continues with the same speed and leaves the hall 10 minutes earlier. The number of questions solved by him?
- How long is 3 hours and 30 minutes in terms of total minutes?
- A ladder slides 12cm in 3 minutes. How much it will slide in 12 minutes?
- If cloth required for 1 shirt is 2m 60cm than cloth required for 7 clothes:
- Aftab Laghari Leaves his house at 20 minutes to seven in the morning, reaches Gul Khan's house another 15 minutes, and leaves for their office which takes another 35 minutes. At which time do they leave Gul Khan's house to reach their office?
- If Tank is full with Pipe A in 15 minutes and empty from Pipe B and C in 40 minutes and 45 minutes respectively, how much time will it take to fill the tank if all pipes are open while the tank is 2/9 full?
- A tank has a capacity of 240 litres. A pipe can empty 1/4th of the tank in 5 minutes and another pipe can empty 1/3rd of the tank in 6 minutes. The tank is filled and both the pipes are opened for 3 minutes. How much of the water is now left in the tank?
- An industrial loom weaves 0.128 meters of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 meters of cloth?