The first nuclear power plant in Pakistan was set up at Karachi in ____?
The first nuclear power plant in Pakistan was set up at Karachi in ____?
پاکستان میں پہلا ایٹمی بجلی گھر کراچی میں کب لگایا گیا تھا؟
Explanation
On 28 November 1972, President Zulfiqar Ali Bhutto inaugurated the Karachi Nuclear Plant
**
Karachi Nuclear Power Plant (KANUPP) Unit 1. KANUPP is Pakistan’s first nuclear power plant,
With a total gross capacity of 137 MW.
K2 & K3 with the help of China
K2 started on 21 May 2021 and has a 1100 MW capacity.
K3 is expected to start in 2022.
**