A stenographer receives instructions from two supervisors. One instructs that meetings must be scheduled on even days, the other demands odd days. If the stenographer schedules on even-hundred days and both supervisors are satisfied, what can be inferred?
ایک اسٹینوگرافر کو دو سپروائزر سے ہدایات موصول ہوتی ہیں۔ ایک ہدایت دیتا ہے کہ ملاقاتوں کو بھی دنوں میں شیڈول کیا جانا چاہئے ، دوسرا عجیب دن کا مطالبہ کرتا ہے۔ اگر اسٹینوگرافر نے یہاں تک کہ سو سوڈ ایام اور دونوں سپروائزر مطمئن ہیں تو ، کیا اندازہ لگایا جاسکتا ہے؟
Answer: One supervisor changed the instruction
Explanation
If the stenographer schedules meetings only on even-numbered days, but both supervisors are satisfied, it implies a change in the original conflicting instruction.
Therefore, one supervisor must have altered their demand to align with even days.
This question appeared in
Past Papers (2 times)
Supreme Court Past Papers and Syllabus (2 times)
This question appeared in
Subjects (1 times)
VERBAL & NON VERBAL INTELLIGENCE TEST MCQS PDF (1 times)
Related MCQs
- Akram went to attend a meeting on Thursday. On reaching the place he came to know that he was 3 days earlier than the scheduled date. If he had reached there on the coming Monday. how many days he would have been?
- Six lectures on 6 different subjects physics, chemistry, Biology, Algebra, Geometry and Astronomy have to be scheduled (one on each day) across 7 days starting Sunday and ending Saturday. The schedule has to be drawn out for the subjects such that i. One day has to be a holiday and it can be neither Sunday nor Saturday. ii. Geometry has to be scheduled immediately after Algebra. iii. Physics cannot start the series in the week and has to be done exactly 2 days before Astronomy. iv. Biology has to be scheduled for Thursday and cannot immediately follow physics. How many days after Physics is Biology?
- P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in _______ days.
- A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the whole work, the daily wages of B and C are:
- Six lectures on 6 different subjects physics, chemistry, Biology, Algebra, Geometry and Astronomy have to be scheduled (one on each day) across 7 days starting Sunday and ending Saturday. The schedule has to be drawn out for the subjects such that i. One day has to be a holiday and it can be neither Sunday nor Saturday. ii. Geometry has to be scheduled immediately after Algebra. iii. Physics cannot start the series in the week and has to be done exactly 2 days before Astronomy. iv. Biology has to be scheduled for Thursday and cannot immediately follow physics. Q. On which day the lecture of Physics is scheduled?
- A and B can do a piece of work in 12 days B and C in 15 days C and A in 20 days then that numbers of days taken by A B and C together to finish the work are?
- Six lectures on 6 different subjects physics, chemistry, Biology, Algebra, Geometry and Astronomy have to be scheduled (one on each day) across 7 days starting Sunday and ending Saturday. The schedule has to be drawn out for the subjects such that i. One day has to be a holiday and it can be neither Sunday nor Saturday. ii. Geometry has to be scheduled immediately after Algebra. iii. Physics cannot start the series in the week and has to be done exactly 2 days before Astronomy. iv. Biology has to be scheduled for Thursday and cannot immediately follow physics. On which day lecture of Geometry is scheduled?
- A completes a work in 12 days. B completes the same work in 15 days. A started working alone and after 3 days B joined him. How many days will they now take together to complete the remaining work?
- Zohaib spends 600 rupess daily in first 12 days, 400 rupees per day in next 80 days and 300 per day in the next 10 days of the month. If he saves Rs. 4000 in that month, find his average daily income?
- A stenographer has been asked to fill out 500 forms. she fills 25 forms by the end of half an hour when she is joined by another stenographer who fill the forms at the rate of 45 per hour. The entire assignment will be carried out in?