Prime Minister Imran inaugurated Peshawar Bus Rapid Transit (BRT) on ______?
Prime Minister Imran inaugurated Peshawar Bus Rapid Transit (BRT) on ______?
وزیر اعظم عمران نے ______ پر پشاور بس ریپڈ ٹرانزٹ (بی آر ٹی) کا افتتاح کیا؟
Explanation
The BRT project started in October 2017.
Built at a cost of Rs 70 billion.
It features a 27.5 kilometre-long corridor track.
Includes 31 stations along the main route.
Has 7 feeder routes stretching 62 km.
These feeder routes include 146 stops.
The system is designed to facilitate thousands of passengers daily.